8695 6650 / C
D - ASSEMBLY - INSTALLATION
POSIMATIC PS30
D-17
5 - INSTALLATION
a) Checking after transport
The positioner is delivered ready for operation.
However, certain preliminary steps should be taken before starting-up:
- make sure that no visible element has been damaged during transport,
- check that the main elements are properly tightened; transport may have loosened them, especially
tilt limit switches,
- check that electrical connections are correct.
b) Checking phase direction
- check that the electrical connections are correct,
- press the plate lowering button «
C5
»
the plate lowers: the phases are connected properly
the plate rises: invert two phases at the connection of the mains supply
When these tests are conclusive, the positioner is ready for starting-up. Repeat these checks each time the
positioner is moved.
Содержание 95032131NG
Страница 9: ...8695 6650 C C DESCRIPTION POSIMATIC PS30 C 5 b Dimensions and space requirements POSIMATIC PS30...
Страница 23: ...8695 6650 C E OPERATOR MANUAL POSIMATIC PS30 E 19...
Страница 32: ...F MAINTENANCE 8695 6650 C F 28 POSIMATIC PS30...
Страница 34: ...F MAINTENANCE 8695 6650 C F 30 POSIMATIC PS30 MECHANICAL PART...
Страница 36: ...F MAINTENANCE 8695 6650 C F 32 POSIMATIC PS30 ELECTRICAL PART...