
IS 402 ECN 3607
Page 6 of 9
Lift the elements up and back Fig 3 (A) until the stay engages behind the bracket
(B).
Fig 3
Clean the tank with warm water and mild detergent. Dry thoroughly.
Re-position the element by gently pushing it back and disengaging the stay until the
element can be lowered back into place. Replace the batter plate, ensuring the tab
locates behind lifting box cover.
Check the drain valve is closed (lever fully left) before adding fresh water to the
level on the batter plate.
Connect the appliance to an electricity supply
– the green neon illuminates to
indicate power to the pasta boiler.
Turn the control knob to the desired setting. The amber neon illuminates.