![Lighting Technologies 1997024290 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/lighting-technologies/1997024290/1997024290_manual_1912052008.webp)
9. Connect mains cable to 3-pole terminals block, next lock the cable by tightening the cable
gland with at least (4+0,5) Nm of torque.
CR QR6 luminaires are delivered with power cord included
10. Release cover catch, close the cover. Slightly press the cover against the lock, turn the lock
clockwise.
11. CR luminaries could be optionally equipped with CS LoRa Luminaire Controller 3.0 (art.
5911000520, should be ordered separately) or Luminaire controller CS LoRa 1.0 (art.
2911000080, should be ordered separately)
To do this remove plug and connect controller according to installation instruction.
IMPORTANT! Serial number sticker is included into eack controller package. One sticker is
placed on the controller, second must be placed on luminaire's support at the height 1.5-2.0
meter. The support surface which sticker is placed on should be clean. ATTENTION! Ignoring
this will lead to inability to identify luminaire's controller serial number thus making direct
illumination control impossible. Controller's power consumption in standby mode - 0.6W
Attention! Controller installation is prohibited when precipitation is going on!
12. ATTENTION!
Check tightening and tighten if needed of the mains cable gland’s nut during installation.
LUMINAIRE LIFTING AND CARRYING BY MAINS CABLE IS NOT ALLOWED, it may cause
moist protection failure, cable and luminaire’s internal circuits damage.
These instructions assume expert knowledge corresponding to a completed professional
education as an electrician.
8
Содержание 1997024290
Страница 1: ...MAGISTRAL LED Manual Montageanleitung ...