5.) Take the other end of the 50cm Connecting Cable from the Car and
then connect it to a spare port on the expansion board. Secure the cable
in place by laying it underneath one of the tiles on the top of by
building.
Turn the AA Battery Pack on and ensure the lights we have installed so
far are working OK.
Содержание Downtown Diner Lighting Kit
Страница 10: ......
Страница 14: ...Continue to reconnect surrounding pieces to the back of the car...
Страница 25: ...Pull the three cables up the corner of the diner and then use tape to secure them down...
Страница 31: ......
Страница 38: ...Reconnect the top section and tile we removed in step 8...
Страница 42: ...Reconnect the top white section...
Страница 45: ...Disconnect the trans clear mini gure head as well as the dish above...
Страница 50: ...Secure the 30cm Connecting cable by laying it underneath the 2x3 plate...
Страница 54: ...Take another 2x White Strip Lights and then stick them to another 2x LEGO Plates 1x6...
Страница 56: ...Secure the 15cm connecting cable which conencts the two strip lights together underneath the 2x14 plate...
Страница 57: ...Take the 30cm Connecting cable and then secure it underneath the 2x6 plate at the bottom as per below...
Страница 62: ...Take a White Strip Light and then connect a 15cm Connecting cable to the left port...
Страница 70: ......
Страница 71: ...With the cable facing toward the left reconnect the trans clear dish to secure the bit light in place...
Страница 77: ......