49.) Neatly place the expansion board and all cables into the corner
space in between the fridges and wall ensure the 30cm cable is left out.
50.) Pull the 30cm cable back up to the other side and then secure this
down by disconnecting the blue 2x3 brick and then reconnecting it over
the top of all 4 cables. Ensure they are all neatly laid in between studs.
Содержание 71016
Страница 43: ...25 Take the 2 billboard lights and connect them to the following positions under the roof ...
Страница 50: ...Now let s turn on the battery pack to test the lights we have just installed ...
Страница 55: ...Reconnect this whole section back to the base of the shop ...
Страница 67: ......