7.) We can now remove the battery pack cable from the top traffic light board (as we only
connected this to test the traffic light board). Replace this with a
15cm connecting cable
,
then connect the other end to the first port on the
12-port expansion board
Take 4x adhesive squares and stick 2 to each board. Mount the traffic light board to the
inside of the building in the top right corner. Hide the excess cables from the traffic light
underneath the board.
Leave the expansion board for now as we will mount this later.
Содержание 103024
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 17: ...Thread the cable around the top of the pole as shown below before reconnecting the pole back to the base plate ...
Страница 23: ......
Страница 28: ......
Страница 30: ...Repeat this step for the red light on the right side ...
Страница 32: ...Do your best to hide the excess cables underneath the grey plates on the top ...
Страница 33: ......
Страница 35: ......
Страница 37: ...Reconnect the lamp with bit light installed to Janine s desk ...
Страница 41: ......
Страница 44: ...Hide the cable underneath the brown tile ...
Страница 46: ...You can hide the excess cable underneath the grey tiles in between studs as shown below ...
Страница 49: ...Reconnect the light back onto the pole and then wind the cable around so that the cable isn t too exposed ...
Страница 50: ...Reconnecting the entire section back to the ceiling beam ...
Страница 51: ...Repeat this same process for the other ceiling light ...
Страница 53: ......
Страница 55: ......
Страница 59: ...To secure the cable from being too obvious use some tape to stick the cable to the side of the wall ...
Страница 64: ...Hide and secure cables underneath the following tiles as shown below ...
Страница 66: ...You can use sticky tape to secure cables like what I have done here ...
Страница 73: ...Reconnect this section with bit light installed back to original position ...
Страница 77: ...Reconnect the video arcade game with flashing light installed ...
Страница 82: ......
Страница 86: ......
Страница 88: ......
Страница 93: ......
Страница 94: ...Pull the cable up along the side wall and then hide the cable behind the wall piece as per below ...
Страница 98: ......
Страница 102: ......
Страница 105: ......
Страница 108: ...47 Take the battery pack and place it on roof in the following position Ensure the on off switch is facing upward ...
Страница 109: ...Connect the battery cable into the left port of the strip light we just installed ...
Страница 111: ...This finally completes installation of the Ghostbusters Headquarters LED Lighting Kit Turn on and ENJOY ...