3 June 2022
Page | 25
10.
Install the UL listed junction box with terminal block inside of the lower pedestal (skip this step if it is factory
installed). Pull the incoming power wires into the UL listed box and properly terminate them to the terminal
block.
11.
Bring incoming power feed wires into the UL listed box, terminate them to the terminal block, attach cover
to UL listed box and attach front cover to lower pedestal. Attach J1772 holsters in proper locations
(depending on single, dual, or side by side install). Install non-cable management rain cover to the top of
the pedestal. Install provided black plastic hole covers to fill any unused holes in the pedestal for a clean
appearance.
12.
Wrap charging cables around the chargers for clean appearance.
Содержание breezEV EVC-L2-D Series
Страница 7: ...3 June 2022 Page 7 SPECIFICATIONS ...
Страница 8: ...3 June 2022 Page 8 DIMENSIONS CHARGER ...
Страница 9: ...3 June 2022 Page 9 NON CABLE MANGAGEMENT PEDESTAL ...
Страница 10: ...3 June 2022 Page 10 CABLE MANGAGEMENT PEDESTAL ...
Страница 13: ...3 June 2022 Page 13 WALL MOUNT INSTALLATION Mechanical Installation ...
Страница 18: ...3 June 2022 Page 18 ...
Страница 21: ...3 June 2022 Page 21 ...
Страница 29: ...3 June 2022 Page 29 STATUS DESCRIPTIONS ON CHARGER Normal ...
Страница 30: ...3 June 2022 Page 30 STATUS DESCRIPTIONS ON CHARGER Abnormal Troubleshooting Errors and warning messages ...