26
X
SECTION 4 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
GOS
ALH
4.6
• Attach the
Lower Extension Arms (AKE)
to the
Top Pole (ALH)
with the hardware shown. If necessary, use a Rubber Mallet to tap
the Coupler Pin Assembly through the holes.
4.2
4.1
• Secure one
Bolt (GDN)
and
Washer (GDO)
to a
Coupler Pin (GDM)
at one end.
GDN
GDO
GDM
GDN
GDO
GDM
GOS
ABN
ABN
GDN
(x2)
GDM
(x1)
GDO
(x2)
ABN
(x2)
• Fit this Washer (GDO) over
the Bolt (GDN) to secure the
hardware to the Coupler Pin.
!
3/16”
(≈5 mm)
(2)
AKE
GOS
(x2)
• Make sure the extension arms are oriented
with these holes toward the top of the pole.
!