37
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
v
(x2)
!!8
(x2)
SEC
Note: Tighten the 1/2” Centerlock Nuts (AAX) until they are fl ush with the ends of the Bolts.
!
AAD
(x2)
7 1/16”
(Not actual length)
ABN
(x4)
,AYTHE"ACKBOARDAND2IMASSEMBLYNEXTTOTHE0OLEASSEMBLY2ESTTHE
Rim on cardboard to prevent scratching. Then secure the
Short and Long
Extension Arms (AKC & AKB)
to the
Top Pole (ALH)
with the hardware shown.
CAUTION
:
HAVE ONE ADULT HOLD THE BACKBOARD IN PLACE
UNTIL ASSEMBLY HAS BEEN COMPLETED!
!!8
ABN
AAD
AKC
!!8
AKC
AKB
AKB
ABN
ABN
ABN
AAD
ALH