background image

STEP 3: Attach the handlebars.Remove the screw, nuts and washers from the rotation rod (part N). Slide 
handlebar rotation rod through the linkage tube at the top of main frame. The rod may need a lithe lubricant to 
easy slide through the bushings at either end of the linkage tube. Center the rod and rotate it until the set hole 
in (the rod aligns with the hole in the center of the linkage tube. Screw the fixing screw into the aligned hole and 
secure it. Remove the parts and bike from the carton and identify them using the expanded illustration. Attach the 
left handle (D), the left handle is marked with an "L". Put the handlebar pivot housing on the left side of the 
rotation rod. Slide the rotation rod's thread stem through pivot housing bushings. Place a washer on stem and 
screw on nut. Place the plastic end cap you can find it in the screw pack onto nut after final tightening. Attach the 
right handle (E) in the same manner. Slide the foam grips (M) on to the handlebars. A small amount of liquid soap 
will ease installation.

STEP 4: Install the pedals.The right pedal (part R) is marked with an ‘R". The left pedal (part L) is marked with 
an "L". It is important that each pedal goes on the proper side. Select the right pedal. Slide a two step pedal 
bushing on to pedal first then slide a ball bearing next to the bushing. Now screw the pedal stem into the right 
pedal arm. Right pedal lightens clockwise. You must secure it tightly. Screw on to the pedal's stem the lock nut 
(SILVER) until tight. Rotate the handlebar's link arm to meet the pedal. Bring the " C ” slot on the link arm up from 
the bottom to hock on the bearing on the pedal stem. Now place the " C " clip locking the link arm on the bearing.

STEP 5: Mount seat (part F). Remove nuts and washers from studs on bottom of seat (F). Place seat onto seat post (G) 
and replace washers and nuts. Secure tightly. Select seat height adjust knob (K), slide the seat post bellow onto the seat 
post first then slide the seat post into main frame aligning a set of holes in the seat post with the seat height screw hole. 
Screw in seat post knob. Secure tightly.

STEP 6: Mount monitor (part H). Insert batteries into battery holder being sure to follow battery diagram. Check to be sure 
monitor shows a display. If it does not, check batteries and battery installation. Plug monitor cable (part J) coming from main 
frame into back of monitor. Slide monitor on to the main frame. 

6

7

Содержание FIT LITE

Страница 1: ...Optional Hand Movement Adjustable Seat Foot Lock Pedal FIT LITE PRO AIR BIKE 1 YEAR W A R R A N T Y...

Страница 2: ...the chain wheel link chain and other moving parts 8 Do not wear loose clothing that could become caught on the exerciser Always wear athletic shoes for foot protection Adjust the pedal straps to keep...

Страница 3: ...the main frame part A screw in 4 Phillips screws securing rear strut to main frame 4 STEP 2 Mount the front strut Place front strut part C into saddle bracket at the front of the frame The square hole...

Страница 4: ...he left pedal part L is marked with an L It is important that each pedal goes on the proper side Select the right pedal Slide a two step pedal bushing on to pedal first then slide a ball bearing next...

Страница 5: ...ep your shoes from slipping away Rubber soled shoes and athletic Socks are recommended NEVER operate without wearing the shoes 5 Place the exercise bike on a hard flat surface in a convenient area Be...

Страница 6: ...cle set up with the handlebars to linked the pedals in synchronized mode sit on the cycle and start pedalling initially with the cycle tension set to a low setting while holding the handlebars Increas...

Страница 7: ...12 WEIGHT LOSS 13...

Страница 8: ...es and incidentals will be borne by the consumer 5 Lifelong obligations are limited to the repair and replacement of the defective product Except as set forth above there are no other express or impli...

Страница 9: ......

Отзывы: