Cabling Procedure
Direct Link
1.
Thread the cable into the head plate assembly at least to the jam nut.
2.
Cycle the machine to ensure that it is in proper working order.
3.
Check the cable to ensure there is proper tension.
4.
Tighten jam nut to 20-25 FT-LBS (27.2 - 34.0 Nm).
Floating Pulley
1.
Measure the threaded end of the floating pulley and cable.
2.
Screw the jam nuts onto the end of the thread on the floating pulley and cable.
3.
Thread the floating pulley into the head plate assembly at least 1/2 inch (12.7mm).
4.
Thread the cable into the frame anchor position.
5.
Measure the exposed threads to verify that at least 1/2 inch (12.7mm) is screwed into the head plate assembly and
frame anchor.
6.
Cycle the machine to ensure that it is in proper working order.
7.
Check the cable to ensure there is proper tension.
Page 44 of 51
Содержание Insignia IS-GLD
Страница 1: ...Insignia Series OWNER S MANUAL 9481201 REV BC ...
Страница 2: ......
Страница 40: ... Manufacturer recommends that cables be inspected daily after installation and replaced annually Page 38 of 51 ...
Страница 52: ...Foot Dimensions Use below image to determine foot specifications Page 50 of 51 ...
Страница 54: ......