Unit Handling
If possible, transport the unit using a fork lift or pallet jack.
• If using a fork lift or pallet jack, ensure that the fork tine length is suitable to safely move the
packaged unit.
• It is recommended by Liebert Corporation that the unit remain in the protective packaging until
located at the installation site.
• When handling and unpacking the unit, exercise great care to prevent damage to the coil fins (see
3.5
Unpacking the Unit
3.5.1 Domestic Packaging
• Remove outer packaging when ready to install the XDO.
• Keep the XDO covered by the unit bag until removal from pallet.