background image

ii

Содержание MPH-EBR09NXXO30

Страница 1: ...AC Power For Business Critical Continuity Liebert MPH User Manual North American European Applications...

Страница 2: ......

Страница 3: ...4 2 2 RPC BDM Installation on Knurr Miracel Frame 9 4 3 Temperature Humidity Sensor Installation Optional 10 5 0 USING THE LIEBERT MPH 12 6 0 SPECIFICATIONS 13 6 1 Agency Approvals 15 6 2 Product War...

Страница 4: ...ii...

Страница 5: ...r burn Do not continue to use the Liebert MPH if the LED panel or monitoring interface indicators are not in accordance with these operating instructions Refer all faults to your local dealer Emerson...

Страница 6: ...rt 15 of the FCC Rules Opera tion is subject to the following two conditions This device may not cause harmful interference and This device must accept any interference received including interference...

Страница 7: ...city up to 22 1kW 230 400VAC 32A or 10 7kW 120 208VAC 30A For further details refer to 6 0 Specifications Remote monitoring is enabled by the included communication card the Liebert RPC which permits...

Страница 8: ...Mount L6 20P or L6 30P plug connection 10 ft 3m input power cord 20 or 30A 27x IEC C13 or 21x IEC C13 plus 6x IEC C19 receptacles 68 25 in 1735mm long 200 240VAC Single Phase Input Output Rack Mount L...

Страница 9: ...a frame member 1 Use four of the 6 32 screws to attach a bracket to each end of the Liebert MPH The supplied brackets have four holes that match holes on each end of the Liebert MPH If mounting on ho...

Страница 10: ...o U Mount 6 Figure 3 Inserting a spring nut into a T slot Figure 4 Attaching a Liebert MPH to a Knurr rack horizontal frame member T slot Spring nut inserted into T slot leaf spring goes inside Tool l...

Страница 11: ...of the unit The cord can be repositioned 90 if it will need to enter from the front To reposition the cord 1 Remove the four screws retaining the input power plate 2 Reposition 90 so that power cord e...

Страница 12: ...dimensions of the Liebert MPH To attach the brackets 1 Hold one mounting bracket against the side of the Liebert MPH making sure that the end of the bracket with the round holes is against the unit 2...

Страница 13: ...ble tie through the slot on the back of the module see Figure 9 Either method permits moving the RPC BDM to a different place in the same rack or to another rack 4 2 1 Mounting Hardware Spring nut M5...

Страница 14: ...humidity levels Each connects to the Liebert RPC which makes readings available to Liebert monitoring methods Only one mounting method is addressed in this manual attaching a single sensor with a brac...

Страница 15: ...sert the included quarter turn fastener through the rectangular hole in the sensor bracket base and into the T slot see Figure 11 5 Turn the fastener clockwise 90 degrees a quarter of a turn 6 Route t...

Страница 16: ...3 Connect input power to the Liebert MPH 4 Route the rack equipment s power cables to the Liebert MPH following proper procedures and good practices such as segregating power cables from control cable...

Страница 17: ...Vertical MPH EBV27NXXQ30 230 32 32 7 3 1 IEC 309 27 IEC C13 Vertical MPH EBV27NXXO30 230 16 16 3 6 1 IEC C20 27 IEC C13 Vertical MPH EBV27NOXR30 400 230 32 32 12 8 3 IEC 309 21 IEC C 13 6 IEC C 19 Ve...

Страница 18: ...3 13 x 68 1 50 x 80 x 1730 17 25 x 7 0 x 1 73 438 x 178 x 44 mm Table 1 Liebert MPH Model numbers and specifications continued Part Number Input Output Form Factor Voltage Rated Amps Max Continuous A...

Страница 19: ...ngs Directive 73 23 EEC CE Markings GS mark safety tested according to DIN EN 60950 1 VBE 0805 1 2006 95 EC and EMC Directive EMD 2004 108 EC according to the Low Voltage Directive LVD Electromagnetic...

Страница 20: ...change without notice Liebert is a registered trademark of Liebert Corporation All names referred to are trademarks or registered trademarks of their respective owners Technical Support Service Web Si...

Отзывы: