Equipment Inspection and Start-Up 25
2.0
E
QUIPMENT
I
NSPECTION
AND
S
TART
-U
P
2.1
Internal Inspection
$ýGHWDLOHGýLQWHUQDOýLQVSHFWLRQýVKRXOGýEHýSHUIRUPHGýDIWHUýWKHýXQLWýLVýLQýSODFHýDQGýEHIRUHýLWýLVýHQHUð
JL]HGñýWRýHQVXUHýWURXEOHðIUHHýVWDUWðXSïý7KHýVDPHýLQWHUQDOýLQVSHFWLRQýVKRXOGýEHýFDUULHGýRXWýZKHQý
SHUIRUPLQJýSUHYHQWLYHýPDLQWHQDQFHï
2SHQýWKHýXQLW
ýðý*DLQýDFFHVVýWRýWKHýLQWHUQDOýFRPSRQHQWVýRIýWKHý'DWDZDYHýXQLWýE\ýUHPRYLQJýWKHý
H[WHULRUýSDQHOVï
9LVXDOO\ýLQVSHFW
ýðý%HýVXUHýZLULQJýDQGýFRPSRQHQWVýDUHýQRWýGDPDJHGïý&KHFNýFDSDFLWRUVýIRUýRLOý
OHDNVýRUýEXOJLQJï
&KHFNýSRZHUýFRQQHFWLRQV
ýðý&KHFNýDOOýSRZHUýFRQQHFWLRQVýIRUýWLJKWQHVVïý5HIHUýWRý
7DEOH è
ýIRUý
WRUTXHýUHTXLUHPHQWVýRIýDOOýHOHFWULFDOýFRQQHFWLRQVï
3HUIRUPýIRUPDOýGHWDLOHGýLQVSHFWLRQ
ýðý)ROORZýWKHýSURFHGXUHVýGHVFULEHGýLQý
êïí ðý,QVSHFWLRQý
DQGý6WDUWð8Sý&KHFNOLVW
ýZKHQýSHUIRUPLQJýGHWDLOHGýLQVSHFWLRQï
2.2
Start-Up
&KHFNOLVWV
ýðý)ROORZýWKHýGHWDLOHGýWKHýVWHSðE\ðVWHSýFKHFNOLVWý
õêïí ðý,QVSHFWLRQýDQGý6WDUWð8Sý
&KHFNOLVWô
ýZKHQýLQVWDOOLQJýDQGýVWDUWLQJðXSýWKHý'DWDZDYHý0DJQHWLFý6\QWKHVL]HUï
,QLWLDOýV\VWHPýVWDUWðXS
ýðýDýTXDOLILHGýHOHFWULFLDQýVKRXOGýEHýHPSOR\HGýWRýSHUIRUPýWKHýHTXLSPHQWý
LQVSHFWLRQýDQGýVWDUWðXSïý/LHEHUWýV\VWHPýVWDUWðXSýPD\ýEHýDUUDQJHGýE\ýFDOOLQJý\RXUýORFDOý/LHEHUWý
VDOHVýUHSUHVHQWDWLYHýRUý/LHEHUWý*OREDOý6HUYLFHVïý,QýWKHý86$ñýFDOOýìðåííðèéêðëêæåï
:DUUDQW\ýHIIHFWLYLW\
ýðý$ýFRS\ýRIýWKHýDSSURSULDWHýFKHFNOLVWýõIXUQLVKHGýZLWKýWKHýHTXLSPHQWôýPXVWý
EHýFRPSOHWHGñýVLJQHGñýGDWHGýDQGýUHWXUQHGýWRýWKHý)DFWRU\ïý:DUUDQW\ýFRYHUDJHýRIýWKHýHTXLSPHQWýLVý
QRWýHIIHFWLYHýXQOHVVýWKHý&KHFNOLVWýLVýUHFHLYHGýE\ýWKHý)DFWRU\ï
$
:$51,1*
9(5,)<ý7+$7ý$//ý,1&20,1*ý32:(5ý$1'ý&21752/ý
&,5&8,76ý$5(ý'(ð(1(5*,=('ý$1'ý/2&.('ý287ý%()25(ý
3(5)250,1*ý7+(ý,17(51$/ý,163(&7,21ï
$
:$51,1*
(48,30(17ý,163(&7,21ý$1'ý67$57ð83ý6+28/'ý%(ý
3(5)250('ý21/<ý%<ý75$,1('ý3(56211(/ï
+$=$5'286ý92/7$*(6ý$5(ý35(6(17ý'85,1*ý67$57ð83ý
352&('85(6ï
(/(&75,&$/ý6$)(7<ý35(&$87,216ý0867ý%(ý)2//2:('ý
7+528*+287ý,163(&7,21ý$1'ý67$57ð83ï
Содержание Datawave
Страница 2: ......
Страница 6: ...2 Figure i Typical Datawave Magnetic Synthesizer Equipment Arrangement...
Страница 8: ...4 Installation Instructions Figure 1 Typical Cabinet and Floor Planning Dimensional Data 100 125 kVA...
Страница 9: ...Installation Instructions 5 Figure 2 Typical Cabinet and Floor Planning Dimensional Data 150 200 kVA...
Страница 13: ...Installation Instructions 9 Figure 4 Electrical Field Connections Self Contained SC Datawave 100 125 kVA...
Страница 14: ...10 Installation Instructions Figure 5 Electrical Field Connections Conditioning Alone CA Datawave 100 125 kVA...
Страница 15: ...Installation Instructions 11 Figure 6 Electrical Field Connections Self Contained SC Datawave 150 200 kVA...
Страница 16: ...12 Installation Instructions Figure 7 Electrical Field Connections Conditioning Alone CA Datawave 150 200 kVA...
Страница 17: ...Installation Instructions 13 Figure 8 Datawave Bypass Configuration 100 200 kVA...
Страница 20: ...16 Installation Instructions Figure 9 Typical Junction Box Connections...
Страница 24: ...20 Installation Instructions Figure 11 Intermodule Wiring 150 200 kVA...
Страница 27: ...Installation Instructions 23 Figure 13 Typical Control Wiring for Units Without Monitoring...
Страница 28: ...24 Installation Instructions Figure 14 Typical Control Wiring for Units With Monitoring...
Страница 44: ...40 Maintenance...