![LiCONiC StoreX STX1000 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/liconic/storex-stx1000/storex-stx1000_quick-start-manual_1907205003.webp)
Management-Handbuch
Produktion
The screwing: Screw each side wall together with the palette with two screw at the outer bottom corner at first
and then with one screw
at the middle.
Next step, screw the sidewalls at the upper corners together, also with two screws. Place screws the whole
edge with a distance of 350 mm. The lid has to be screwed once together with each sidewall and each corner.
Take counter sunk head wood screws 4.5x50 with non-stop thread. Screw in the screw heads flush. Don’t
counterbore the screws in the wood!
Tape six corner pads on the front wall and screw it together with the palette.
Screw the sidewalls with the palette together. Push the incubator completely to the front, it has to be close to
the corner pads.
Wind the transfer station in air pad foil and put this between the incubator and the ground.
Tape the back corner pads on the wood cube and screw together with the sidewall. The unit has to be close
between the front and the back corner pads so it can’t move during the transport.
Outside
visible
Screw the back wall and the lid.
Packing_STX1000.doc
2010.10.18
Page 3 of 3