background image

5755000K

Copyright © Liberty Pumps, Inc. 2020 All rights reserved.

7 | EN

Gravity Fall: 

The unit accepts wastewater by gravity; it does not 

vacuum in water. All inlet pipework must have a positive gravity 

fall (1/4 inch per foot drop minimum).

Vertical Lift:

 If vertical lift is required, this must precede the 

horizontal pipe run. All vertical lifts should rise as close to the 

macerator as possible, allowing only for the need to clear the 

toilet tank. The initial horizontal run should not exceed 12 inches. 

Once the horizontal run is started, do not change directions in a 

vertical manner.

Discharge:

 All discharge piping from the unit should run either 

directly vertical or in a horizontal plane (with a minimum 1/4 inch 

per foot drop) to the point of discharge. Pipework must not be 

installed with a diagonal upward slope from the unit to the point 

of discharge. Long downward pitched runs of discharge piping, or 

piping where the point of discharge is at a lower elevation than 

the macerator unit, should be designed to prevent siphoning from 

the macerator tank.

Friction:

 Friction losses from horizontal runs without 1/4 inch per 

foot pitch will reduce the amount of vertical lift the system is 

capable of handling. Refer to Figure 3. Consult factory for proper 

sizing if there are long runs or multiple elbows.

Lift Calculations: 

To pump vertically and horizontally, calculate 

3 ft of vertical lift as equivalent to 30 ft of horizontal run. Each 

bend or change of direction gives a pressure drop, which must be 

calculated into the total head of the unit. As an estimate, reduce 

discharge height by 3 ft for each 90° bend.

For example: 

1” Schedule 40 

PVC pipe is used for the 

discharge and runs 

horizontally for 1 ft, then 

turns 90°, and rises 5 ft 

vertical. Then it travels 

horizontal with another 90° 

turn (3 turns in total) and 

connects with the soil-stack. 

Refer to Figure 2.
Calculations:
[

A

] Total vertical lift 5 ft= 5 ft 

vertical

[

C+D+E

] Total horizontal run 

43 ft = 4.3 ft vertical

[

B

] Total of three 90° elbows 

= 9 ft vertical

Add the three calculation 

totals together to get 18.3 ft 

of vertical head (lift). Referring 

to Figure 3, the application 

would result in a flow rate of 

23 gal/min (60 Hz).

 Figure 2. Example Calculations

 Figure 3. Performance Curve

 Macerating Unit Preparation

Auxiliary inlets should be plumbed using the supplied auxiliary 

inlet couplings and/or reducing bushing when connecting to 

either 2” or 1-1/2” standard Schedule 40 PVC pipe. A plug must be 

removed by turning until the rib is vertical and pulling outward. 

Pliers may be required if unit has been stored.
Both the discharge and vent flanges are shipped from the factory 

in the horizontal orientation. If the installation allows for a vertical 

orientation, the four screws must be removed from each in order 

to flip the flange. The decorative cover will need to be modified 

with the use of a hole saw and cutters to remove material. A 

template is provided on the underside of the decorative cover.

1 ft

[30.5cm]

5 ft

[1.5m]

30 ft

[9.1m]

12 ft

[3.7m]

[E]

[B]

[B]

[B]

[D]

[A]

[C]

0

5

10

15

20

25

30

35

40

45

0

5

10

15

20

25

30

35

40

0

1.5

3.0

4.6

6.1

7.6

9.1

10.7

12.2

37.9

56.8

18.9

0

75.7

94.6

113.6

132.5

151.4

170.3

US Gallons Per Minute

Total Head in Feet

Liters Per Minute

Total Head in Meters

50 Hz

60 Hz

Discharge flange 
PVC solvent 
weld 1” schedule 
40 PVC pipe

Vent flange PVC 
solvent weld 
1-1/2” schedule 
40 PVC pipe

Discharge and vent 

flanges 

in horizontal orientation

Discharge and vent flanges 

in vertical 

orientation

Содержание Ascent II-ESW

Страница 1: ...Pumps com or contact Liberty Pumps at 800 543 2550 Retain dated sales receipt for warranty Serial Mfg Date Install Date Installation Manual 5755000K Copyright Liberty Pumps Inc 2020 All rights reserve...

Страница 2: ...ndoor dry location use only Serious injury or death could result Do not use an extension cord to power the product Extension cords can overload both the product and extension cord supply wires Overloa...

Страница 3: ...controls and must be protected from direct water exposure during installation and use Sanitary fixtures connected to the macerating system must be located on the same floor level Introduction Before i...

Страница 4: ...ng toilet and needs no special maintenance with normal use Any regular bathtub up to 100 gallons or shower can be used When installing these fixtures build a 6 inch high platform for the fixture to be...

Страница 5: ...ceptacle is accessible under the left decorative cover Do not install battery until the unit has been installed connected and ready for operation Auxiliary Inlets The macerator unit is equipped with t...

Страница 6: ...left side When roughing in allow for the macerator Discharge Never discharge directly into an open drain fixture manhole or rainwater drainpipe It is illegal as it constitutes a health hazard Only dir...

Страница 7: ...e 40 PVC pipe is used for the discharge and runs horizontally for 1 ft then turns 90 and rises 5 ft vertical Then it travels horizontal with another 90 turn 3 turns in total and connects with the soil...

Страница 8: ...tallation manual s provided with it Be careful when tightening fasteners as to not crack the porcelain Figure 4 Placement Options Figure 5 Toilet Connections 1 To mount the toilet to a concrete floor...

Страница 9: ...or Sewer The discharge piping can be made from 3 4 or 1 diameter PVC pipe Use long turn bends and avoid elbows where possible The connection to the soil stack or sewer pipe must be made with an appro...

Страница 10: ...scharge flange has an integrated check valve The valve is held in place by a support backing plate that is also connected to the discharge hose To access the check valve first remove the discharge fla...

Страница 11: ...e and once engaged the base can be rotated counterclockwise until it is free Accessibility to Motorized Cartridge The motorized cartridge can be accessed through the access opening or removal of the m...

Страница 12: ...acle GFCI are on Check condition of circuit breaker or fuse Ensure plug is not loose If the pumping unit thermal overload has activated it will take about 20 minutes to reset Decorative Covers Ensure...

Страница 13: ...e may be blocked The piping must be cleaned Unit not vented correctly Unit must be vented properly to open air to allow water to enter the macerator tank Confirm vent is clear Do not use a quick vent...

Страница 14: ...tor is either not plugged in supply breaker is turned off or GFCI receptacle has tripped Check electrical power source Control system in battery protection mode 1 Unplug macerator from receptacle 2 Re...

Страница 15: ...over on page 10 General plumbing During the draining of the bathtub the alarm sounds and or water backs up into the toilet The inflow is greater than the macerator can handle A full port ball valve sh...

Страница 16: ...operated or maintained per manufacturer instructions if it has been disassembled modified abused or tampered with if the electrical cord has been cut damaged or spliced if the pump discharge has been...

Отзывы: