- 17 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
3.5.1 PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet at both sides
and at the back.
2. Slide the unit out from the cabinet by gripping the base pan
handle and pulling forward while bracing the cabinet.
3. Cut the window sash seal to the proper length. Peel off the
backing and attach the Foam-PE to the underside of the
window sash.
4. Remove the backing from Foam-PE with 3 holes and attach
it to the bottom of the Top retainer bar.
5. Attach the Top retainer bar onto the top of the cabinet with 3
screws (Type A).
6. Insert the Frame guides into the bottom of the cabinet.
7. Insert the Frame Curtain into the Top retainer bar and
Frame guides.
8. Fasten the curtains to the unit with 10 screws (Type A) at
both sides.
SCREW, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
Foam-PE
Top retainer bar
Top retainer bar
Foam-PE
Screw
(Type A)
Screw(Type A)
Frame guide
Shipping screws
Figure 20
Figure 21
Figure 22
Figure 23
3.5 SUGGESTED TOOL REQUIREMENTS
Содержание WR-1820
Страница 30: ...P NO 3828AR3735R MARCH 2008 ...