
7. Service and Calibration
- 117 -
7.2.3 Equipment Setup
7.2.4 Calibration steps
A. RX Calibration
In order for the RSSI measurements to be within the GSM specifications, some calibration is
necessary. Also, due to AGC implementation, some AGC specific constants need calibration. In total,
three calibrations are required per receive band, AGC calibration, channel compensation and
temperature compensation. Of these, temperature compensation is not needed in replacement of the
circuit. In AGC calibration the reference power fed into the phone via permanent antenna connector is
-74dBm. In channel compensation, the channel numbers in Rx band are;
E-GSM band : 0, 40, 124, 975, and 1023.
DCS band : 512, 574, 636, 700, 760, 822 and 885.
Procedure
a) Initialize phone by clicking Initialize button.
b) Set the GSM test equipment CW mode and BCH and TCH of GSM test equipment ‘0’, same with
phone.
c) Set the power of GSM test equipment ‘-74dBm’.
d) Click the PM Start button, then the value, received power by phone, is displayed in PM
measurement window at service software.
e) Change the BCH and TCH of phone by clicking the Number button and set the channel (BCH &
TCH) of equipment to be same.
Mobile Switch Cable
Power Supply
GPIB
Cable
PC
Battery Simulator
Jig
TA
GSM Test Set(8960)
GPIB Cable
Figure 7-1 Calibration Equipment List
Содержание T5100
Страница 1: ...Service Manual Model T5100 Service Manual T5100 P N Date June 2004 Issue 1 0 ...
Страница 24: ...2 TECHNICAL BRIEF 25 Figure 15 Power Supply Scheme ...
Страница 71: ...4 RF PART TROUBLESHOOTING 72 4 2 Trouble Shooting of Receiver Part Figure 48 RF ...
Страница 83: ...5 DISASSEMBLY INSTRUCTION 84 5 1 Disassembly 5 DISASSEMBLY INSTRUCTION 1 2 ...
Страница 84: ...5 DISASSEMBLY INSTRUCTION 85 ...
Страница 85: ...5 DISASSEMBLY INSTRUCTION 86 ...
Страница 86: ...5 DISASSEMBLY INSTRUCTION 87 ...
Страница 87: ...5 DISASSEMBLY INSTRUCTION 88 ...
Страница 88: ...5 DISASSEMBLY INSTRUCTION 89 ...
Страница 89: ...5 DISASSEMBLY INSTRUCTION 90 ...
Страница 90: ...5 DISASSEMBLY INSTRUCTION 91 ...
Страница 91: ...5 DISASSEMBLY INSTRUCTION 92 ...
Страница 92: ...5 DISASSEMBLY INSTRUCTION 93 ...
Страница 93: ...5 DISASSEMBLY INSTRUCTION 94 ...
Страница 94: ...5 DISASSEMBLY INSTRUCTION 95 ...
Страница 95: ...5 DISASSEMBLY INSTRUCTION 96 ...
Страница 96: ...5 DISASSEMBLY INSTRUCTION 97 ...
Страница 97: ...5 DISASSEMBLY INSTRUCTION 98 ...
Страница 99: ...6 2 Download Procedure 1 Execute Fluid_GUI exe and select Erase Program flash menu 6 Download 100 ...
Страница 100: ...6 Download 101 2 Click the Add button Then choose m0 file which is going to download ...
Страница 102: ...6 Download 103 4 Press Global Settings menu Choose a correct serial port and set the configuration as below ...
Страница 104: ...6 Download 105 6 Wait for downloading to be finished ...
Страница 108: ...6 Download 109 3 Click the 3 DSP Boot Download button Then choose bin file which is going to be download ...
Страница 110: ...6 Download 111 5 Click 5 Sticker Download button Then choose bin file which is going to be download ...
Страница 120: ... 121 8 CIRCUIT DIAGRAM 8 1 RF Interface ...
Страница 121: ... 122 2 3 8 2 Base Band Interface ...
Страница 123: ... 124 2 2 300mA 12 8 150mA 4 11 12 6 3 150mA 3 5 10 7 9 300mA 4 N9 NC23 8 4 DSP ...
Страница 124: ... 125 Fe r r i t e be a d BLM18PG121SN1D 8 5 Memory Interface USB interface ...
Страница 125: ... 126 8 6 MIDI Audio ...
Страница 126: ... 127 8 7 I O Receptacle USB Interface IrDa Interface D G S ...
Страница 127: ... 128 8 8 Keypad VA3 VA2 VA1 ...
Страница 128: ... 129 9 PCB LAYOUT 9 1 Main Top ...
Страница 129: ... 130 9 2 Main Bottom ...
Страница 130: ... 131 9 3 Keypad Top ...
Страница 131: ... 132 9 4 Keypad Bottom ...
Страница 135: ... 136 12 EXPLODED VIEW REPLACEMENT PART LIST 12 1 EXPLODED VIEW ...
Страница 136: ... 137 12 1 EXPLODED VIEW ...