51
General installation guideline
General Installation Procedure
6RWU0-03A
PTAC
1. General Installation Procedure
Installation Procedure
Determination of work scope
……
Selection of suitable location
for unit
……
Installation of indoor unit
……
Drain pipe work
……
Insulation works
……
Fit Outer Grille
……
Transfer charge to customer
……
Remarks
Check and confirm required load calculation, model
selection etc…
The base or the foundation of the Air-Conditioner
should be firm and vibration proof and air-flow should
not be restricted on either side of the unit - front and
the back.
Check the size of the selected model and make sure
the fitting is made correctly.
Make sure the drain pipe is big enough and adjust it
to a downward gradient.
The Air-Conditioner supporting parts should secure
firmly to the wood, masonry and metal.
The Air Conditioner should be protected from
physical contact with animals or any external object.
Educate the customer or the operator on how
to operate the Air-Conditioner and the utility
of the manuals.
Installation of Wall sleeve
……
Check out the Wall opening to make sure the Wall
sleeve fits properly.
Содержание PTAC Type
Страница 1: ...6RWU0 03A PTAC Type 60Hz R410A ...
Страница 10: ...10 General information PTAC 6RWU0 03A ...
Страница 60: ...Installation 60 Installation of unit 6RWU0 03A PTAC ...