
COMMUNICATION KIT INSTALLATION
13
ENGLISH
Mechanical installation
1
Remove the Comm. Kit box cover by unscrewing the plastic bolt (6EA)
2
Drill 4 holes on correct position and fix the Comm. Kit box securely with 4 screws
(Field supply) through the provided holes Ø4.5mm (Reference the length of the holes Ø4.5)
3
48 mm
33
2 mm
Provided holes
Ø4.5 mm (4EA)
COMMUNICATION KIT INSTALLATION