background image

ACCEASSORY PARTS

3

ENGLISH

1. 

Connect CN_OUT with Outdoor Unit by

the cable (provided)

2. 

 

Connect RS-485 BUS_A(+) and

BUS_(B)(-) with other network products 

(ex. Central Controller , I-Gateway.....)

3. 

Select DIP Switch Configuration.

4. 

Connect CN_PWR with Outdoor PCB

Power connector

5. After Power is ON, check the Communica-

tion LED 

- LED2G(Yellow), LED3G(Orange)

• Normal : LED blinks continuously

• Error : Check the DIP Switch setting &

wiring connections.

6. 

Check RS-485 Communication Status

LED: 

• Normal : LED blinks when PI485 re-

ceives data from central con-

troller.

• Error : Check the wiring connections

7. Finally if all of the above steps are OK, then

tie the cables by tie wraps & clamp.

* Example about 14kW ODU.

ACCEASSORY PARTS

Others : Tie Wrap (3 EA) - Cable Tie

Clamp (1 EA) 

PP485B00K

Multi-V 

Multi-V 

Multi

BRACKET (1EA)

WIRE ASSY 1(1EA)

WIRE ASSY 2(1EA)

WIRE ASSY 3(1EA)

SCREW (4EA)

INSTALLATION GUIDE

Installation Steps

Install the Modbus Converter after
checking the hole for screw.

CAUTION

!

The wrong setting of air-conditioner switch could
cause malfunctioning. Switch setting must be
done carefully. Push the Reset button after
changing the Dip switch.

CAUTION

!

1 and 2 ON, All others OFF

ON

1

2

3

4

5

6

7

8

DIP Switch Configuration

ON

1

2

3

4

5

6

7

8

ON

1

2

3

4

5

6

7

8

Содержание PP485B00K

Страница 1: ...dards by authorized personnel only Please retain this installation manual for future reference after reading it thoroughly Modbus Converter PP485B00K ENGLISH PORTUGUÊS MALTI MAGYAR SLOVENČINA БЪЛГАРСKN SLOVENŠČINA SRPSKI LATVIEŠU VALODA HRVATSKI LIETUVIŲ KALBA SVENSKA GAEILGE NORSK МАКЕДОНСКИ SUOMI SHQIP DANSK ÍSLENSKA EESTI KEEL BOSANSKI ITALIANO ESPAÑOL FRANÇAIS DEUTSCH ΕΛΛΗΝΙΚΆ ČEŠTINA NEDERLAN...

Страница 2: ...hock Use the correctly rated breaker or fuse There is risk of fire or electric shock Do not install remove or re install the unit by yourself customer There is risk of fire electric shock explo sion or injury For installation always contact the dealer or an Authorized Service Center There is risk of fire electric shock explo sion or injury Operation When the product is soaked flooded or sub merged...

Страница 3: ...rom central con troller Error Check the wiring connections 7 Finally if all of the above steps are OK then tie the cables by tie wraps clamp Example about 14kW ODU ACCEASSORY PARTS Others Tie Wrap 3 EA Cable Tie Clamp 1 EA PP485B00K Multi V Multi V Multi BRACKET 1EA WIRE ASSY 1 1EA WIRE ASSY 2 1EA WIRE ASSY 3 1EA SCREW 4EA INSTALLATION GUIDE Installation Steps Install the Modbus Converter after ch...

Страница 4: ...4 ENGLISH ...

Страница 5: ...esentative LG Electronics Inc EU Representative Krijgsman 1 1186 DM Amstelveen The Netherlands Manufacturer LG Electronics Inc Changwon 2nd factory 84 Wanam ro Seongsan gu Changwon si Gyeongsangnam do KOREA ...

Отзывы: