INSTALLATION
19
ENGLISH
Main function of SW02E
Setup the switch of HR Unit
ON S/W
Selection
No.1
Method for pipe detection of an HR Unit (Auto/Manual)
No.2
No. of connected branches
No.3
No.4
No.5
Master/Slave (Main PCB) Setting
No.6
EEPROM factory initialization (4,5,6)
No.7
Use only in factory production (preset to "OFF")
Zoning setting ("ON")
No.8
Use only in factory production (preset to "OFF")
SW
Function
DIP
SW
SW02E
(8pin DIP SW)
Selection of the method for pipe
detection
Selection of Master/Slave Main PCB
Setting the Zoning Control
Selection of the No. of connected
branches
SW01E
(4pin DIP SW)
Selection of the valve to address
Rotary
SW
0
SW01D
(Left)
Selection of the Valve Group Control
SW01C
(Right)
Manual addressing of zoning indoor
units
Setting to address HR units
Push
SW
SW02B
(Left)
Increase in the digit of 10
SW01B
(Right)
Increase in the digit of 1
Содержание Multi V PRHR023
Страница 28: ...28 ENGLISH ...