
5-10
COMPONENTS
TEST PROCEDURE
RESULTS
1
3
5
Relay 2
Relay 1
FUSE
THERMAL
CUT-OUT
Disconnect the 7 pin
connector from P.C.B.
(Refer to schemetic diagram)
RELAY 2 OF P.C.B.
(Wire leads removed.)
Note: Relay
Relay 1: Fan motor
Turntable motor
Oven lamp
Relay 2: Microwave
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor switches,
H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch and the
fuse at the same time. Replace just the fuse if the switches operate normally.
Check for P.C.B. connector.
Normal Abnormal
0°C~Approx.110°C Approx.110°C
Cooking Start OFF
Cooking Start OFF
Содержание MS-1942G
Страница 9: ...SCHEMATIC DIAGRAM 4 3 8 ...
Страница 29: ...6 2 13581A 14970A 14026A 13552A 13213A 13352A 13720D 13536A DOOR PARTS EV ...
Страница 30: ...6 3 23506A 23572A 268711 WTT021 24781S CONTROL PANEL PARTS EV ...
Страница 31: ...6 4 33390G 35889A WTP013 WTT010 WTT021 33112U 36549S 33052A OVEN CAVITY PARTS EV ...
Страница 32: ...6 5 WSZ085 44510A 466001 466003 466001 43500A LATCH BOARD PARTS EV ...
Страница 34: ...6 7 56170D 63302A 65006B WTT028 WSZ002 63303A 948502 BASE PLATE PARTS EV ...