![LG MS-114ML Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/lg/ms-114ml/ms-114ml_service-manual_1899347020.webp)
COMPONENTS
TEST PROCEDURE
RESULTS
5-10
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 100)
Measure the resistance.
(Ohm-meter scale: R x 1000)
POWER
LEVEL
10%
4 sec
18 sec
20%
6 sec
16 sec
30%
8 sec
14 sec
40%
10 sec
12 sec
50%
12 sec
10 sec
60%
14 sec
8 sec
70%
16 sec
6 sec
80%
18 sec
4 sec
90%
20 sec
2 sec
100%
22 sec
0 sec
Normal: Approx. 65~80
Ω
Abnormal:
∞
or several
Ω
Normal: Approx. 2~4 K
Ω
Abnormal:
∞
or several
Ω
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 2
Relay 1
Power
Transformer