5-8
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
TEST PROCEDURE
RESULTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
Approx.: 1.4 ohm
Approx.: 90 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Normal: Less than 1 ohm
Normal: Infinite
PRIMARY
TERMINAL
SECONDARY
WINDING
FILAMENT
WINDING
TERMINAL
COMPONENT TEST PROCEDURE
LGE Internal Use Only
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Содержание MB3949G
Страница 28: ... 6 2 13552A 13213A 13581A 13720D 14970A 14026A 13536A 14890A DOOR PARTS EV ...
Страница 29: ... 6 3 23506A 23572A 24510L 250201 24970A 268711 WTT028 24781M CONTROL PANEL PARTS EV ...
Страница 31: ... 6 5 466001 466003 WSZ085 466001 43500A 948503 56912B 55262A 43501A LATCH BOARD PARTS EV ...
Страница 33: ... 6 7 56170D 63302A 63303A WTT021 WSZ002 65006B 65006B 948502 BASE PLATE PARTS EV ...
Страница 34: ......