16
Ventilator
Installation
Cover of Control Box
Screw
Cord Clamp
1(L) 2(N)
Power
GND
GN/YL
BR BL
Method to Connect Power Cord
1. Release two screws and then open
the cover of the control box.
•
With reference to the below wiring diagram,
accurately connect the main power cords into
the terminal block.
2. After inserting the power cord into the bushing,
fully insert it into the terminal block for connection.
• Fix the power cords with the clamp.
• Make sure that the power cords may not be removed by pulling them.
3. Wiring specifications
Wiring specifications
Sheathed wire (should be complied with IEC60245 standard)
Size
0.75 - 1.25mm
2
Length
MAX. 100m
External contact specifications
Normally closed contact (Current tolerance 10mA - 0.5A)
Precautions when laying power
wiring
Use round pressure terminals for
connections to the power terminal block.
Round pressure terminal
Power wire
The Power cord connected to the unit should be selected according to the following specifications .
CAUTION
Содержание LZ-H050GBA2
Страница 28: ...28 Ventilator ...
Страница 29: ......