Window Installation
Window opening measurements:
A
B
MODEL
Dimension
A(inch) Min
23 1/4”(59.1cm)
36”(91.4cm)
12 3/8”(31.4cm)
5000 BTU
A(inch) Max
B(inch) Min
A.
Width
B.
Height
Remove Packaging Materials
NOTE:The air conditioner must set upright for
one hour before operating.
Remove and dispose of/recycle packaging
materials. Remove tape and glue residue from
surfaces before turning on the air conditioner.
Rub a small amount of liquid dish soap over the
adhesive with your fingers.Wipe with warm
water and dry.
Do not use sharp instruments,rubbing alcohol,
flammable fluids,or abrasive cleaners to
remove tape or glue.These products can
damage the surface of your air conditioner.
Handle the air conditioner gently.
Unpack the Air Conditioner
Prepare Air Conditioner for Installation
1. Place the top channel on the top of the air
conditioner, lining up the holes in the top
channel with the holes in the top of the air
conditioner.
2. Using three
”
screws,attach the top
channel to the air conditioner.
Install Top Channel
NOTE:
Your model may differ from the one
shown.
A.
” screws
B. Top channel
A
B
Содержание LW5012J
Страница 1: ......
Страница 2: ...Before Operation 7 ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ...NOTE Your air conditioner may differ from the one shown ...
Страница 9: ......
Страница 10: ......
Страница 19: ......
Страница 20: ... XVWRPHU QIRUPDWLRQ HQWHU 5HJLVWHU RXU SURGXFW 2QOLQH ZZZ OJDSSOLDQFHV FRP 7521 6 1 6 OYDQ YH QJOHZRRG OLIIV 1 ...