- 36 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
7. Test running
RESET
RESET
RESET
Battery cover
Discharge air
Bolt
Tubing
connection
Settlement of Outdoor Unit
• Anchor the outdoor unit with a bolt and nut
(ø10cm) tightly and horizontally on a concrete or
rigid mount.
• When installing on the wall, roof or rooftop, anchor
the mounting base securely with a nail or wire
assuming the influence of wind and earthquake.
• In the case when the vibration of the unit is con-
veyed to the house, settle the unit with an anti-
vibration rubber.
2) Evaluation of the performance
1. Measure the temperature of the intake and dis-
charge air.
2. Ensure the difference between the intake tem-
perature and the discharge one is more than 8
°C(Cooling) or reversely (Heating).
1) Connection of power supply
1. Connect the power supply cord to the inde-
pendent power supply.
• Circuitbreaker is required.
2. Prepare the remote controller.
• Insert two batteries provided.
Remove the battery cover from the remote con-
troller.
• Slide the cover according to the arrow direction.
Insert two batteries.
(Two "R03" or "AAA" dry-cell batteries or equiv-
alent.)
• Be sure that the (+) and (-) directions are cor-
rect.
• Be sure that both batteries are new.
Re-attach the cover.
• Slide it back into position.
3. Operate the unit for fifteen minuites or more.
Содержание LS-E0960CD
Страница 67: ...P NO 3828AR7190X JULY 2008 ...