Service Manual
19
Installation
• Bundle the piping and drain hose together by
wrapping them with cloth tape over the range with-
in which they fit into the rear piping housing sec-
tion.
8. Reroute the pipings and the drain hose across
the back of the chassis.
9. Set the pipings and the drain hose to the back of
the chassis with the tubing holder.
• Hook the edge of tubing holder to tap on chassis
and push the bottom of tubing holder to be
engaged at the bottom of chassis.
10. Indoor unit installation
• Remove the spacer.
• Ensure that the hooks are properly seated on the
installation plate by moving it left and right.
Press the lower left and right sides of the unit against the
installation plate until the hooks engage into their
slots(clicking sound).
1. Align the center of the pipings and sufficiently
tighten the flare nut by hand.
2. Finally, tighten the flare nut with torque wrench
until the wrench clicks.
• When tightening the flare nut with torque wrench,
ensure the direction for tightening follows the
arrow on the wrench.
mm
inch
kg.m
Ø6.35
1/4
1.8
Ø9.52
3/8
4.2
Ø12.7
1/2
5.5
Ø15.88
5/8
6.6
Ø19.05
3/4
6.6
Outside diameter
Torque
Drain hose
Vinyl tape(narrow)
Pipe
Wrap with
vinyl tape(wide)
Piping for
passage through
piping hole
Outdoor unit
Gas side piping
(Bigger diameter)
Liquid side
piping
(Smaller
diameter)
Torque wrench
Tubing holder
Drain hose
Connecting
cable
Connection of the Pipes-Outdoor
Содержание LS-C246TLB3
Страница 39: ...Service Manual 39 Schematic Diagram Schematic Diagram TELEPHONE CONTROL MODEL ONLY Electric Control Device ...
Страница 40: ...40 Room Air Conditioner Schematic Diagram Cooling Model LED TYPE ...
Страница 41: ...Service Manual 41 Schematic Diagram HVB TYPE PLASMA ...
Страница 68: ...P No 3828A20173N September 2004 Printed in Korea ...