Installation of Unit
Installation Manual
13
Connecting the Cable to Indoor Unit
• In order to protect cable, it should be inserted “Bushing Rubber”.
• The inside and outside connecting cable can be connected after opening the inlet grille.
Knock-out holes
Fig 1
Fig 2
Fig 3
1. Open the inlet grille manually. (Fig
1
)
2. Open the control cover with Driver(
).
3. Connect the cables (LG does not supply) to the terminal block in the control box.
4. Secure the control cover to the original position with the screw.
5. Close the inlet grille. (Fig 3)
Detail of Fig 2
• Cooling Model
• Heat Pump Model
• Heat Pump + Heater Model
1
2
3
4
To outdoor unit
5
6
1
2
3
4
To outdoor unit
5
6
To outdoor unit
To the main
terminal block
❈
To the main terminal block "1(L), 2(N)" of outdoor unit.
1
2
3
4
5
6
Содержание LPUC306KA0
Страница 20: ...20 Floor Standing type Air Conditioner Memo ...
Страница 21: ......