37
ţ
Remove the ring plug (1) from the valve located at the
top of such device.
ţ
Place compression nut and the ferule at the end of the
pipeline. Insert pipeline into the connection valve as far
as possible. Hold tightly while holding pipeline.
Compression
Nut 1/4”
Ferule
Hold on to the pipe from the handles or grabbers located
behind the refrigerator, loosing first the bolt holding the
handle. Afterwards, insert pipe into the hole and tighten
bolt to finalize.
10. OPEN THE BYPASS VALVE
Tighten all connections
containing leaks. Place access
cover back on compressor.
11. CONNECT TO REFRIGERATOR
Fix pipeline in a way that
it does not vibrate on the
refrigerator or wall. Push
refrigerator against wall.
12. TURN ICE MAKER ON
Turn ice maker switch into the
ON
position. Ice maker
will start only after reaching its operating temperature
of 15 °F (-9 °C) or less. It will automatically begin the ice
production if switch is located in the
ON
position.
1
CONNECTING THE WATER LINE
Содержание lfxs24623 series
Страница 2: ......
Страница 45: ...NOTES NOTAS ...
Страница 89: ......
Страница 91: ......
Страница 92: ......