- 17 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
5. Connecting Cables between Indoor Unit and Outdoor Unit
1) Connecting cables to the Indoor Unit
Connect the wires to the terminals on the control board individually according to the
outdoor unit connection.
• Ensure that the color of the wires of outdoor unit and the terminal No. are the same as
those of indoor unit respectively
2) Clamping of cables
1) Arrange 2 power cables on the control panel.
2) First, fasten the steel clamp with a screw to the inner boss of control panel.
3) For the cooling model, fix the other side of the clamp with a screw strongly.
For the heat pump model, put the 0.75mm
2
cable(thinner cable) on the clamp and tighten it
with a plastic clamp to the other boss of the control panel.
4) In Australia, the length of power supply cord measured from the entry of the power supply
cord to the middle of live pin on the power plug should be over 1.8m.
Make sure that the screws of the terminal are free from looseness.
WARNING
POWER INPUT
(220-240V~)
1(L)
2(N)
The power cord
connected to the outdoor unit should be
complied with the following specifications (Rubber
insulation, type H05RN-F approved by HAR or SAA).
If the supply cord is damaged, it must be replaced by a special cord or assembly availible from the manufacturer of its service agent.
The connecting cable
connected to the indoor and outdoor
unit should be complied with the following specifications
(Rubber insulation, type H05RN-F approved by HAR or SAA).
CAUTION
20m
m
GN/YL
NORMAL�
CROSS-SECTIONAL�
AREA 0.75mm
2
(30K)
20m
m
GN/YL
Capacity
30K BTU/h
1 Phase
3.5mm
2
NORMAL CROSS-SECTIONAL AREA
• Cooling only type
Terminals on the indoor unit
1(L) 2(N)
1(L) 2(N)
4
5
3
Terminals on the outdoor unit
6
5
3
Содержание LBNG3061YL
Страница 50: ...P NO 3828A20097R JULY 2008 ...