- 83 -
6. Repairing
3. Test Specification
Measurement item and specification is shown as below :
4. Test Procedure
Test items should be sequential in the table shown as below :
5. BackUp Battery Check
BackUp Battery Check must performed after FT process
Back Up Battery Check process is shown as follows :
1. RTC time is automatically set up at FT process(2004/01/01 00:00)
2. Check the RTC time next process
Note : Stingray’s BackUp Battery will become empty in 2.5 days. BackUpBattery test must be performed
within two days after soldering VIB FPC.
LGE Internal Use Only
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Test item
MODE
Specification
TX Maximum Power
E-GSM
+24dBm ~ +43dBm
Test item
MODE
Specification
Current Value
Max 100£ÌA
USB I/F Check
Detection of HHP COM port
ITEM
DETAIL
PTE command
Specification
Check RTC time
Check the RTC
HexPeek,700CC008,3,1
Min05a39a80(HEX)
clock register value
Max05a4ec00(HEX)
(24hour)
Test item
MODE
Procedure
Start up
E-GSM
1. Set dummy battery to HHP
2. Link cable is connected (auto power ON)
3. Put Into test mode
TX Power
E-GSM
1. ARFCN is assign to Mch
2. Set PL to 5(E-GSM)
3. Measure output power
Current Check
1. Input following PTE command.
Use PTE Command, <Magic Number>
ContTx off
Backlight off
Key Backlight off
SelectBacklight off
2. Check current value
USB I/F Check
1. Check detection of HHP COM port *
1