4-13
DECK MECHANISM DISASSEMBLY
Gear Assembly P3
Gear Assembly P2
Base Assembly P2
Base Assembly P3
Arm Assembly Idler
(For Normal Models)
(
For Jog Shuttle Models
)
Arm Assembly Idler Jog
or
Optional Parts
(H3)
Gear Assembly P2
Gear Assembly P3
(A)
(A)
(B)
(B)
Chassis
H1
H2
Fig. A-10
31. Gear Assembly P3 (Fig. A-10-1)/
Gear Assembly P2 (Fig. A-10-2)
1) Unhook the two Hooks(H1) and lift up the Gear Assembly
P3.
2) Unhook the two Hooks(H2) and lift up the Gear Assembly
P2.
32. Base Assembly P3 (Fig. A-10-3)/
Base Assembly P2 (Fig. A-10-4)
1) Move the Base Assembly P3 in the direction of the arrow of
the Chassis Hole(A) and push down the Base Assembly P3.
2) Move the Base Assembly P2 in the direction of the arrow of
the Chassis Hole(B) and push down the Base Assembly P2.
33. Arm Assembly Idler or Arm Assembly
Idler Jog(Fig. A-10-5)
1) Unhook the Hook(H3) and push down the Arm Assembly
Idler Jog.
1) Arm Assembly Idler is for Normal Models.
2) Arm Assembly Idler Jog is for Jog Shuttle Models.
1) When reassembling, confirm that the (A) Part of the Gear
Assembly P3 is aligned to the (B) Part of the Gear Assembly
P2 as shown below.
NOTE
NOTE
Gear Assembly P3
Gear Assembly P2
(A)
(B)
(Fig. A-10-1)
(Fig. A-10-2)
(Fig. A-10-4)
(Fig. A-10-3)
(Fig. A-10-5)
(Unloading Condition)
Содержание KF-20P31
Страница 11: ...2 2 EXPLODED VIEW 330 320 315 603 610 601 602 A00 501 520 174 913 510 112 153 170 150 310 943 400 120 ...
Страница 29: ...3 16 PRINTED CIRCUIT BOARD MAIN ...
Страница 31: ...3 18 POWER ...
Страница 33: ...3 20 CPT AV 14 AV 20 ...
Страница 78: ......
Страница 79: ......
Страница 80: ...Aug 2002 Printed in Korea P NO 3828VD0067G ...