Installation
18
Installation
Starting
1.
Select a good location.
Place your fridge-freezer where it is easy to use.
2.
Avoid placing the unit near heat sources, direct
sunlight or moisture.
3.
To ensure proper air circulation around the fridge -freezer,
please maintain sufficient space on both the sides as well as
top and maintain at least 2 inches (5 cm) from the rear wall.
4.
To avoid vibration, the unit must be leveled. If
required, adjust the leveling screws to compensate for
the uneven floor.
The front should be slightly higher than the rear to
aid in door closing.
Leveling screws can be turned easily by tipping the
cabinet slightly.
Turn the leveling screws counterclockwise( ) to
raise the unit, clockwise( ) to lower it.
5.
Clean your fridge-freezer thoroughly and wipe off all
dust accumulated during shipping.
6.
Install accessories such as ice cube box, etc., in their
proper places. They are packed together to prevent
possible damage during shipment.
7.
Connect the power supply cord (or plug) to the
outlet. Don't double up with other appliances on the
same outlet.
When your fridge-freezer is installed, allow it 2-3 hours
to stabilize at normal operating temperature prior to
filling it with fresh or frozen foods.
If power plug is disconnected, allow 5 minutes delay
before restarting.
Your fridge-freezer is now ready for use.
Содержание GR-B469BSGW
Страница 2: ......
Страница 39: ...111 Memo ...
Страница 40: ...Memo 112 ...
Страница 41: ...113 Memo ...
Страница 42: ...P No MFL37986151 ...