![LG GR-262 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/lg/gr-262/gr-262_service-manual_1902574019.webp)
7-1-2 DEFROSTING
1. The defrosting is performed each time when the total running time of the compressor reaches 7 hours.
2. After the power is turned on (or restored after a power failure), the defrosting starts when the total running time of the
compressor reaches 4 hours.
3. When the temperature of the defrosting sensor reaches 13 °C or above, the defrosting stops. If the temperature does not
reach 13 °C in 2 hours after the defrosting starts, the defrosting error code is displayed.
(Refer to 7-1-4 Error Diagnostic Mode.)
4. With the defective defrosting sensor (cut or short-circuited wire), the defrosting will not be performed.
7-1-3 SEQUENTIAL OPERATION OF ELECTRIC COMPONENTS
The electric components, such as the comp, defrosting heater, and cooling fan, start sequentially to avoid the noise and
damage to the part, which may result from the simultaneous start of various components on turning the power on or after
the completion of a test.
Condition of Operation
Operating Sequence
If the temp of the defrosting
sensor is 25 °C or above
(For the initial use after the
purchase or grounding)
If the temp of the defrosting
sensor is below 25 °C
(After a power failure or SVC)
- 19 -
POWER
in 0.5 sec
COMP & COOLING FAN
ON
ON
POWER
in 0.5 sec
DEFROSTING
in 10 sec
DEFROSTING
ON
HEATER ON
HEATER OFF
in 0.5 sec
COMP & COOLING FAN
ON
When the po
wer is turned on
Содержание GR-262
Страница 30: ...7 4 MAIN PWB ASS Y AND PARTS LIST 7 4 1 MAIN PWB ASS Y 30 1 R B52DZ R B55DZ ...
Страница 31: ...7 4 2 REPLACEMENT PARTS LIST 31 ...
Страница 33: ...7 5 PWB DIAGRAM 33 ...
Страница 34: ... 34 ...
Страница 37: ... 37 235A 233A 203A 201A 200A 231A 230A 212G 205A 241D 241B 210A 212C 212A 243A 212A 212C ...
Страница 42: ...P No 3828JD8330A JAN 2002 Printed in Korea ...