5-10
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1 )
POWER
LEVEL
1
4 sec
18 sec
2
6 sec
16 sec
3
8 sec
14 sec
4
10 sec
12 sec
5
12 sec
10 sec
6
14 sec
8 sec
7
16 sec
6 sec
8
18 sec
4 sec
9
20 sec
2 sec
10
22 sec
0 sec
Normal:
A: Approx. 85 ~ 100 ohm.
B: Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohms.
Normal: Approx.100~150 ohm
Abnormal: Infinite or several
ohm.
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 2
A
B
Содержание GoldStar GMS-1120TW
Страница 27: ...6 2 DOOR PARTS 13581A 13720D 13352A 13213A 13552A 15006A 13536A 14026A 14970A EV ...
Страница 28: ...6 3 24781M 23506A 23572A 23550D 24510L 24970A 250201 268711 WTP018 CONTROLLER PARTS EV ...
Страница 29: ...6 4 OVEN CAVITY PARTS 33112U WTT021 WTT010 33390G 35889A WTP013 36549S 33052A EV ...
Страница 30: ...6 5 LATCH BOARD PARTS WSZ085 466001 466003 466001 43500A EV ...
Страница 32: ...6 7 56170D WTT021 63302A WSZ002 948501 WTT028 647781 63303A BASE PLATE PARTS EV ...
Страница 33: ......