
VALVE (Main Wash)
1 Disconnect the wiring connector.
1
2 Remove the valve by two screws of the valve
holder.
Rating : 12V
Resistant : 3.5~4.5 k
When reconnecting the connector
1 Open the door completely.
2 Remove the three screws from the hinge.
When removing the Door Assembly, it is
necessary to hold the Bracket that is inner of
the Cabinet Cover.
First, prepare a bucket to put in the remained
water.
Pull it out from hose.
Blue/Black
INLET VALVE
DOOR
Removing method of remained water
CAP(REMAING HOSE)
55
VALVE ( Pre Wash)
Gray/Black
2
Содержание F4V7VYP1WE.ABWQPFS
Страница 6: ...3 PARTS IDENTIFCATION 6 ...
Страница 9: ...1 2 3 1 2 3 9 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...9 Par t i nspect i on 48 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...51 ...
Страница 52: ...52 50 I II I I I II I II II I I I I I I I I I I I I I I ...
Страница 66: ...59 P No MFL69882965 ...