25
INSTALLATION
ENGLISH
Three-Wire Power Cord
•
A 3-wire connection is NOT
permitted on new construction
after January 1, 1996.
•
A UL-listed strain relief is required.
•
Use a 30-amp, 240-volt, 3-wire,
UL-listed power cord with #10
AWG-minimum copper conductor
and closed loop or forked
terminals with upturned ends.
1
Remove the terminal block access cover on
the upper back of the dryer.
2
Install a UL-listed strain relief into the power
cord through-hole.
3
Thread a 30-amp, 240-volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
UL-Listed
Strain Relief
UL-Listed 3-Wire Power Cord
4
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
5
Attach the neutral (white) wire to the center
terminal block screw.
6
Connect the external ground (if required by
local codes) to the green ground screw.
7
Tighten all screws securely.
8
Reinstall the terminal block access cover.
External Ground Wire (If
required by local codes)
Ground
Screw
Hot (Black) Neutral (White)
Hot (Red)
White Wire
from Dryer
harness
Содержание DLE3400 Series
Страница 51: ...51 MEMO ...
Страница 52: ...52 MEMO ...
Страница 104: ...52 NOTAS ...
Страница 105: ...53 NOTAS ...
Страница 106: ...54 NOTAS ...
Страница 107: ...55 NOTAS ...
Страница 108: ......