INSTALLATION
9
ENGLISH
Outside diameter
A
Drill a Hole in the Wall
- Drill the piping hole with a ø65 mm hole core
drill. Drill the piping hole at either the right or
the left with the hole slightly slanted to the
outdoor side.
Flaring Work
Main cause for gas leakage is due to defect of
flaring work. Carry out correct flaring work in
the following procedure.
Cut the pipes and the cable
1
Use the piping kit accessory or the pipes
purchased locally.
2
Measure the distance between the indoor
and the outdoor unit.
3
Cut the pipes a little longer than measured
distance.
4
Cut the cable 1.5m longer than the pipe
length.
Burrs removal
1. Completely remove all burrs from the cut
cross section of pipe/tube.
2. While removing burrs put the end of the
copper tube/pipe in a downward direction
while removing burrs location is also
changed in order to avoid dropping burrs
into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after finishing
flare work)
Flaring work
1
Firmly hold copper pipe in a bar with the di-
mension shown in below table table
below.
2
Carry out flaring work with the flaring tool.
5-7mm
(3/16"~5/16")
Indoor
WALL
Outdoor
Copper
pipe
90°
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
mm
inch
mm
Ø6.35
1/4
1.1~1.3
Ø9.52
3/8
1.5~1.7
Ø12.7
1/2
1.6~1.8
Ø15.88
5/8
1.6~1.8
Ø19.05
3/4
1.9~2.1
Содержание ARNU07GSBL2
Страница 22: ...22 ENGLISH ...