CONNECTING PIPES
21
ENGLISH
1m
1m
A
B
D
F
G
B
G
D
B
H
I
J
A
E
B
I
A
B
D
C
Inner wall (concealed)
Floor (fireproofing)
Penetrating portion on fire
limit and boundary wall
Roof pipe shaft
Outer wall
Outer wall (exposed)
Ⓐ
Sleeve
Ⓑ
Heat insulating material
Ⓒ
Lagging
Ⓓ
Caulking material
Ⓔ
Band
Ⓕ
Waterproofing layer
Ⓖ
Sleeve with edge
Ⓗ
Lagging material
Ⓘ
Mortar or other incombustible caulking
Ⓙ
Incombustible heat insulation material
When filling a gap with mortar, cover the penetration part with steel plate so that the insulation
material will not be caved in. For this part, use incombustible materials for both insulation and
covering.(Vinyl covering should not be used.)
Penetrations
Содержание APUQ100LFT0
Страница 34: ...34 ENGLISH ...