10
INSTALLATION
ENGLISH
Set screw of
paper pattern (4 pieces)
Keep the length of *( ) mm between
the air conditioner bottom surface
and the ceiling surface
Paper pattern
for installation
90mm
Adjust the same height
False
ceiling board
Ceiling
Keep the length of the bolt
from the bracket to 40mm
Open the ceiling board
along the outer edge of the
paper pattern
Air Conditioner body
False ceiling board
* The following parts are local purchasing.
①
Hanging Bolt - W 3/8 or M10
②
Nut - W 3/8 or M10
③
Spring Washer - M10
④
Plate Washer - M10
*( )
→
TQ/TR : 31~34mm
TM/TM-A/TN/TP/TP-B : 15mm
Drain Piping
• Drain piping must have down-slope (1/50 to
1/100): be sure not to provide up-and-down
slope to prevent reversal flow.
• During drain piping connection, be careful
not to exert extra force on the drain port on
the indoor unit.
• The outside diameter of the drain connec-
tion on the indoor unit is 32mm.
- Piping material: Polyvinyl chloride pipe VP-
25 and pipe fittings
• Be sure to install heat insulation on the drain
piping.
- Heat insulation material: Polyethylene
foam with thickness more than 8 mm.
Maintenance
drain port
Upward
routing
not allowed
Pipe clamp
Indoor unit
1/50~1/100
MAX 700mm
CAUTION
!
Tighten the nut and bolt to prevent the
unit from falling.
Содержание AMNQ12GTRA1
Страница 21: ......