INSTALLATION OF INDOOR
9
Selection of the best location
- The place shall easily bear a load exceeding
four times the indoor unit’s weight.
- The place shall be able to inspect the unit as
the figure.
- The place where the unit shall be leveled.
- The place shall allow easy water
drainage.(Suitable dimension “H” is
necessary to get a slope to drain as figure.)
- The place shall easily connect with the
outdoor unit.
- The place where the unit is not affected by
an electrical noise.
- The place where air circulation in the room
will be good .
- There should not be any heat source or
steam near the unit
- Confirm the positional relationship between
the unit and suspension bolts.
- Thermal insulator the ceiling opening to clean
the filter or service under the product.
Installation of Unit
Install the unit above the ceiling correctly.
Position of suspension Bolt
- Apply a joint-canvas between the unit and
duct to absorb unnecessary vibration.
- Apply a filter Accessory at air return hole.
CASE 1
INSTALLATION OF INDOOR
Top view
Unit: mm
Front view
Unit: mm
Front
Inspection hole
600 x 600
Control box
1 000
20 or more
Air outlet vents
Air inlet vents
600
600
(Unit:mm)
A
B
C
D E F G H
I
J
18 / 24 /30
933.4 971.6 619.2 679 35 270 4.5 857 200 900
36
1 283.4 1 321.6 619.2 679 35 270 4.5 1 206 200 1 250
48 / 50 / 54 /60 1 283.4 1 321.6 619.2 679 35 360 4.5 1 206 291 1 250
Dimension
Capacity
(kBtu/h)
ENGLISH
Drain hole
C
E
G
D
F
I
A
J
B
H