![LG AB-Q24GM1A2 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/lg/ab-q24gm1a2/ab-q24gm1a2_installation-manual_206506009.webp)
INSTALLATION OF INDOOR
ENGLISH
9
Caution for gradient of unit and
drain piping
Lay the drain hose with a downward inclina-
tion so water will drain out.
- Always lay the drain with downward inclina-
tion (1/50 to 1/100). Prevent any upward flow
or reverse flow in any part.
- 5mm or thicker formed thermal insulator
shall always be provided for the drain pipe.
- Upward routing not allowed
- Install the P-Trap (or U-Trap) to prevent a
water leakage caused by the blocking of in-
take air filter.
Ceiling
Ceiling
1~3 mm
Drain hole
Drain pump unuse
Drain pump use
Drain hole
• Install declination of the indoor unit is
very important for the drain of the duct
type air conditioner.
• Minimum thickness of the insulation for
the connecting pipe shall be 5 mm.
• The unit must be horizontal or declined
to the drain hose connected when
finished installation.
CAUTION
!
Drainage hole
Make sure to be closed.
Unit
Drainage pipe
(Local supply)
Thermal insulator
(Local supply)
INCORRECT
CORRECT
U-Trap
B
C
A 70 mm
B 2C
C 2 x SP
SP = External Pressure
(mmAq)
Ex) External Pressure
= 10 mmAq
A 70 mm
B 40 mm
C 20 mm
A