Part 5. Trouble Shooting
- 73 -
Copyright ©2014 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Display
code
Title
Cause of error
Check point & Normal condition
62
Heat Sink High
Inverter PCB heatsink tem-
perature is over 85°C
• ODU fan locking
• Heatsink assembly of INV PCB assemble condi-
tion abnormal
• Defect of temperature sensing circuit part defect
of INV PCB
■
Error Diagnosis and Countermeasure Flow Chart
Is installation
condition normal ?
No
Yes
1. Check fan locking
2. Check covering of heat exchanger
3. Check distance between ODU and obstacles
4. Check pipe distortion and abnormality
5. Check service valve is opened
-> Eliminate causes for abnormal condition
Check resistance between NO.14 pin and
NO.16 pin of IPM module
• 85kΩ ± 6.3% (at 25℃)
• Replace main PCBA it abnormality found
Is assemble condition
of INV PCB heatsink normal ?
Is PCB temperature
sensing part normal ?
No
No
Yes
Check assemble condition between INV PCB heatsink and
PFC & IPM module
’
Reassemble if abnormality found
VSS
VSS
VSS
VFO
VFO
Recheck installation condition
and connection of Heat sink
Yes
Содержание A2UW18GFA0
Страница 113: ...P NO MFL68280201 January 2014 ...