- 35 -
LGE Internal Use Only
Copyright ©
LG Electronics. Inc. All rights reserved.
Only for training and service purposes
List the basic steps that should typically be followed to remove components and materials requiring
selective treatment:
1.OPTIONAL: Depending upon the complexity of the disassembly process, a graphic depicting the locations
of items contained within the product which require selective treatment
(with descriptions and arrows identifying locations) can be inserted below:
1
Unlock screw (
“
A-17EA
”
) and (
“
B-4EA
”
)to separate back cover assembly.
Unlock screw (
“
C-4EA
”
) to separate the base.
[Fig.1]
2
Separate the cushion (D,E) from backcover.
[Fig.2]
3
Unlock screw (
“
F-5EA
”
) to sepparate power board .
Unlock screw (
“
F-4EA
”
) to sepparate main board and AV bracket(G,H).
Unlock screw (
“
F-8EA
”
) to sepparate wall moun
ti
ng bracket.
[Fig.3]
5
Unlock screw (
“
A-1EA
”
) to separate wi
fi
assembly from module backcover.
Separate the wi
fi
bracket (J) from wi
fi
assembly.
[Fig.5]
4
Separate the receive assembly from front cover;
Separate the receive board from IR LENS;
Separate the PC sheet (I) from IR LENS.
[Fig.4]
Product Disassembly Process
Содержание 50UH5500 65UH5500
Страница 63: ......
Страница 66: ...Overview for 16 ULTRA HD Model K2Lp Hardware ...
Страница 68: ...LCD TV Repair Guide 16 years New Models Applicable Model UH55 ...
Страница 73: ...2 K2Lp Block Diagram Internal LGE Confidential ...
Страница 82: ...TROUBLE SHOOTING GUIDE ...
Страница 110: ...Appendix Exchange Power Board PSU No Light Dim Light Dim Light Dim Light No picture Sound Ok A 3 5 ...