![LG 42PQ30 Series Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/lg/42pq30-series/42pq30-series_training-manual_217544040.webp)
RL101
F101
SC101
AC In
IC701
P813
1
2
24
23
F801
L602
L601
RL103
T30
1
P811
Hot Gr
ound
Hot Ground
Hot Ground
VR502
Va
VR901
Vs
1
T901
F302
8A/250V
1A/250V
Stby 338V
Run 388V
4A/250V
Stby 338V
Run 388V
Both F801
and F302
read from
Hot Gnd
Primary Bridge
Rectifie
r
42PQ30 SMPS (LIGHT BULB) STATIC TEST UNDER LOAD
42PQ30 SMPS (LIGHT BULB) STATIC TEST UNDER LOAD
1
2
5
or
8
or
4
or
Using two 100 Watt light bulbs, attach on end to Vs and the other end to ground. Apply
AC to SC101. If the light bulbs turn on, allow the the SMPS to run for several minutes to
be sure it will operate under load. If this test is suscessful and all other voltages are
generated, you can be assured the power supply is OK.
Vs
Gnd
Also check
Pins 6 or 7 for
proper Va
Note: The light bulb test is not necessary for the SMPS to turn on and stay on.
This SMPS will run without a load. But it is necessary to test the SMPS under a load.
Check Pins 9, 10, 11
or 12 for 5V-STBY
Check Pins 1 or 2
for 17V
Check Pin 18 for
AC Det 5V
100
W
100
W
The Main PWB will
not function without
STBY 5V and AC Det
arriving from the
SMPS.
Check Pins 5 or 6
for 12V
Any time AC is
applied to the
SMPS, STBY 5V
and AC DET should
be present.
40
Содержание 42PQ30 Series
Страница 14: ...14 Preliminary Information 42PQ30 42PQ30 Remote Control 42PQ30 Remote Control TOP PORTION BOTTOM PORTION ...
Страница 103: ...103 Preliminary Information 42PQ30 Main PWB Regulator Checks Main PWB Regulator Checks ...
Страница 120: ...This page intentionally left blank ...
Страница 123: ...This page intentionally left blank ...
Страница 124: ...123 Preliminary Information 42PQ20 This concludes the Presentation Thank You End of Presentation End of Presentation ...