4-4
Carrier Frame Assembly Removal
The carrier rail mounted by two screws on the carrier frame is
included with the carrier frame (11B5584). The carrier rail, which is
not available as a FRU, is mounted in the elongated slots at the
factory. During adjustment, the rail is pushed to the rear as far as it
will go, before the mounting screws are tightened.
1. Remove the front cover.
2. Remove the rear cover.
3. Remove the sheet feeder.
4. Disconnect the power supply connector at the system board.
5. Remove the two screws that secure the carrier frame to the
base assembly.
6. Remove the screw that secures the power supply frame to the
carrier frame.
7. Slide the carrier frame assembly off the base assembly.
8. To replace the carrier frame, remove all associated parts from
the old carrier frame and install them on the new carrier frame.
Carrier Home Sensor Removal
1. Remove the front cover.
2. Remove the rear cover.
3. Disconnect the sensor cable from the system board.
4. Remove the screw that secures the sensor to the carrier frame.
5. Remove the sensor.
Содержание 3000 Color Jetprinter
Страница 10: ...x ...
Страница 42: ...4 12 ...
Страница 44: ...5 2 ...
Страница 46: ...6 2 ...
Страница 48: ...7 2 Assembly 1 Covers ...
Страница 50: ...7 4 Assembly 2 Paper Feed Carrier Transport Maintenance ...
Страница 52: ...7 6 Assembly 2 Paper Feed Carrier Transport Maintenance ...
Страница 54: ...7 8 Assembly 3 Electronics ...
Страница 56: ...7 10 Assembly 3 Electronics Continued ...
Страница 58: ...7 12 Assembly 4 Carrier ...
Страница 60: ...7 14 Assembly 5 Sheet Feeder ...
Страница 62: ...7 16 ...
Страница 64: ...X 2 T Tests Print NVRAM Contents 3 2 Reset NVRAM Defaults EMEA 3 3 U S 3 3 Test Page 3 4 ...