![Lexington Forge LX32DV Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/lexington-forge/lx32dv/lx32dv_installation-and-operating-instructions-manual_1888249020.webp)
20
51D0528
HO
T
HOT
VENT INSTALLATION
4. Apply a bead of non-hardening mastic around the outside
edge of vent cap. Position the vent cap in the center of hole
on the exterior wall with the word “UP” on the vent cap
facing up. Insure proper clearance of 1" to combustibles
is maintained. Attach the vent cap with four wood screws
supplied.
See Figure 21.
Do not recess vent termination
into any wall. This will cause a
fire hazard.
W
ARNING
NOTE: Replace the wood screws with appropriate
fasteners for stucco, brick, concrete, or other types
of siding.
For vinyl siding, stucco, or wood exterior use vinyl siding
standoffs between vent cap and exterior wall. The vinyl siding
standoff prevents excessive heat from melting the vinyl siding
material. Bolt the vent cap to the standoff. Apply non-harden-
ing mastic around outside edge of the standoff instead of the
vent cap assembly. Use wood screws provided to attach the
standoff.
See Figure 22.
5. Slide fire stop over the vent pipe before connecting the
horizontal run to the vent cap.
See Figure 23.
6. The pipe overlap should be a minimum of 1
1
/
4
". Apply
silicone to the outer pipe connection. Fasten all vent con-
nections with screws provided.
7. Slide fire stop against the interior wall surface and attach
with srews.
See Figure 23.
Figure 21 - Installing Horizontal Vent Cap
REAR WALL VENT INSTALLATION
(continued)
Figure 22- Installing Vinyl Siding Standoff
Apply
Mastic to
All Four
Sides
Vent Cap
Wood
Screw
Cut Vinyl Siding
Away to Fit Standoff
Wood Screw
Vent Cap
Screw
Apply Mastic to
All Four Sides
Standoff
Figure 23 - Connecting Vent Cap with Horizontal
Vent Pipe
Interior Wall
Surface
Fire Stop
Assembly
Horizontal
Vent Pipe
Screw
Vent Cap
(Horizontal
Termination)
Deflecting Shield
Deflecting Shield