2.1.2 Lifting the unit 

 
The Thruster is heavy so when lifting the Thruster unit from its packing case, 
ensure that adequate lifting strops are used. The Thruster should not be lifted 
by its lead screw assembly or propeller shroud. Extra caution should be used 
to avoid damaging these parts, the micro switches and control box. When 
moving the Thruster, ensure that the seating surfaces of the main housing are 
protected against potential damage. The control box is secured to the 
Thruster for protection during transit. A picture is included in the transport box 
showing advised lifting method. 
 

2.1.3 Fitting into the hull 

 

The thruster requires a watertight compartment to be constructed within the 
hull to house the shroud assembly, with an opening in the bottom of the hull 
for the shroud to be lowered through. 
 
 The top of this watertight compartment is to act as the mounting seat for the 
thruster base plate. This watertight compartment must be designed to take the 
weight of the thruster, the transfer of thrust to the hull and any additional 
forces created while the vessel is in motion. It is recommended that this is 
carried out by a qualified navel architect.  
 
When planning the Hull piece cut-out and watertight box, it is important that 
the box gives adequate all-round clearance for the shroud of approx 5-10mm 
(3/16-3/8”). Once the Thruster seating support has been fabricated and a 
suitable hole has been cut in the hull, the Thruster can be installed. 
 
 Seat the unit down on a thin gasket of closed cell neoprene or a suitable 
sealing compound. The base plate is pre-drilled with 8.5mm holes (250 VRTT) 
or 10.5 holes (300 VRTT) see unit diagrams. It is recommended that stainless 
steel bolts of property class 70 are used with nuts, plain washers and locking 
washers. If fitting into an aluminium hull the base plate may be welded to the 
watertight box. The thruster base plate is corrosion resistant 5083-T6. 
 
The VRTT Thruster is supplied in the retracted position for ease of 
transportation. The Thruster will need to be lowered once located, to have the 
hull faring fitted. To lower the Thruster, either energise the raise/lower motor 
or by using the mechanical lead screw (refer to Manual Raise/Lower section 
for details). 
 
Usually, the hull piece that has been cut out of the hull would be re-used to 
provide the Thruster closing plate. This can be attached to the ribs moulded 
into the tunnel shroud. The raise lower motor can take a hull piece up to 50kg 
(110lbs). If additional bolts are being used, ensure that the bolt heads do not 
foul the propeller tips inside the shroud. A landing or register (see diagram 
below) should be moulded into the hull cut out, to allow the hull closing piece 
to 'locate' when the Thruster is fully retracted. This is to prevent water flooding 

Содержание 250 VRTT Series

Страница 1: ...250 300 VRTT Revision D 07 03 07...

Страница 2: ...Hull fitting 4 2 1 4 Raise Lower setting 6 2 1 5 Painting 7 2 2 Thruster Main Drive Installation 2 2 1 Hydraulic 8 2 2 2 Electric 9 2 3 Thruster Electrical Control Installation 14 3 OPERATION 22 4 MAI...

Страница 3: ...0 VRTTH high displacement bronze If there is any problem found during installation or use contact your nearest Lewmar agent or contact us at www lewmar com Note Additional accessories such as control...

Страница 4: ...of the hull The performance of the Thruster is largely due to the power source supplying the Thruster motor Adequate space should be allowed inside the hull for hydraulic hoses electric cables and ac...

Страница 5: ...ce for the shroud of approx 5 10mm 3 16 3 8 Once the Thruster seating support has been fabricated and a suitable hole has been cut in the hull the Thruster can be installed Seat the unit down on a thi...

Страница 6: ...oad being applied to the Thruster leg when the vessel is pounding at sea A sealing gasket is recommended between the closing plate and hull register This should be of a resilient material that will no...

Страница 7: ...tic stop It is suggested that to guarantee trouble free operation that a thread locking compound i e Loctite 243 is applied to the nuts on final setting When raised ensure that the limit switch actual...

Страница 8: ...be anti fouled Always use the appropriate anti fouling that is compatible with surface being covered refer to antifoul paint manufacturers instructions ensuring a through coverage of all exposed surf...

Страница 9: ...aller if in doubt Hydraulic motor ports 250 300 VRTT A B 3 4 BSP Drain 1 4 BSP NOTE Motor Drain line must be connected Equipment should be accessible to allow for routine maintenance oil changes etc K...

Страница 10: ...ld be installed in the positive line The location should be easily accessible and known to the responsible person on board The thruster battery switch must be switched off when no one is on board It i...

Страница 11: ...000 0000 24V 29ft 41ft 52ft 66ft 84ft 105ft 48V 68ft 86ft 108ft 138ft 174ft 218ft Electric bow thrusters use powerful electric motors it is very important that there is sufficient battery capacity an...

Страница 12: ...sult in a short to the thruster body Use the examples on the next page to check for a correct installation on both V and 0V battery connections 1 Correct installation Supplied cable boots are used and...

Страница 13: ...the battery switch off or fuse removed Use a continuity tester to check for a connection between ve stud and motor body and also between ve stud and motor body In both cases the meter should give no...

Страница 14: ...lation or damage IMPORTANT Do not run the thruster out of the water even for a few seconds the motor will overspeed by 300 causing damage to the seals etc and invalidate the warranty Any foreign objec...

Страница 15: ...tor if installing a VRTTE Note also that the supply must be suitable to handle a dc motor inrush current of 45A for 10mS The control box is fitted with a circuit breaker which is sized specifically su...

Страница 16: ...se lower control switches lamps 6 7 Volt free contact 5Amax Closed circuit when the thruster is in the UP position 8 9 Volt free contact 5Amax Closed circuit when the thruster is in the DOWN position...

Страница 17: ...lour coded looms Loom 1 for direct interface with the VRTT control box and Loom 2 for either direct interface to the VRTTE main drive motor control black box or for hydraulic valve control The colour...

Страница 18: ...l of the thruster must be sourced by the installer This loom must have a minimum current carrying capacity of 1 Amp and should meet all relevant standards and regulations Note the VRTTE has additional...

Страница 19: ...18 VRTTE Main Drive Control Power Connections 24Vdc...

Страница 20: ...19 48Vdc...

Страница 21: ...separate fused circuit As a matter of safety and for the prevention of damage to the thruster it is necessary that the second thruster down volt free contact in the VRTT control box is wired into this...

Страница 22: ...iring to the VRTT control box The raise and lower switches must be momentary action and the on off switch a latching action The circuit shows LED indicators but filament bulbs can be used For VRTTH ma...

Страница 23: ...er is in mid stroke of raising or lowering Raise switch Enabled when the On Off switch is On a brief push of this switch will cause the thruster to automatically retract if not already fully retracted...

Страница 24: ...f the down light will stay on it is dangerous to get underway with the Thruster not in the fully raised position ii If power is switched off during the Raise Lower operation all lights will go out and...

Страница 25: ...opellers replace if damaged Clean debris from Leg Shroud Check Shroud for cracks or damage replace if necessary Clean Carbon dust from motor brush gear using a soft brush And vacuum 250 VRTTE only 24...

Страница 26: ...e corrosion process There are 6 anodes fitted to the under water area 2 on the Propeller shaft and 4 mounted directly on to the base plate Recommended anode inspection plan First six 6 months One 1 mo...

Страница 27: ...r motor using a 8mm spanner and 3mm hex key Note When re fitting do not over tighten 2 Place a suitable 17mm spanner or socket drive onto the top of the leadscrew Clockwise to raise Anti clockwise to...

Страница 28: ...Note Version Shown is Hydraulic Dim A Accounts for Both Electric Hydraulic...

Страница 29: ......

Страница 30: ...Lewmar s negligence b Lewmar grants no warranties regarding the fitness for purpose use nature or satisfactory quality of the goods ii Where the laws of the country do not permit a warranty to be exc...

Страница 31: ...ncluyendo sin limitaci n cualquier perdida de beneficios previstos da o a la reputaci n o cr dito perdida de futuros negocios esperados da os costes o gastos pagaderos a terceras partes o cualquier ot...

Страница 32: ...arkost eller utrustning D dsfall eller personlig skada f rutsatt att ej samkats av Lewmars f rsumlighet Det finns inga garantier i syfte p s ljbarhet av n got slag uttryckligen eller antydd och inga g...

Отзывы: